Study for the implementation of the Nagoya Protocol in Belgium Presentation of possible options for the implementation
Download |
![]() |
---|---|
View | Open in browser |
Upload date | 25 Nov 2014 |
Release date | 21/06/2012 |
# | File name | Contributor | Upload date | Size | Content type | |
---|---|---|---|---|---|---|
1 | German | A5-proposed-preliminary-options-np.pdf (current) | 25 Nov 2014 | 126 KB |
![]() |
|
1 | A5-proposed-preliminary-options-np.pdf (current) | 25 Nov 2014 | 126 KB |
![]() |
||
1 | Dutch/Belgium | A5-proposed-preliminary-options-np.pdf (current) | 25 Nov 2014 | 126 KB |
![]() |
|
1 | French/Belgium | A5-proposed-preliminary-options-np.pdf (current) | 25 Nov 2014 | 126 KB |
![]() |
This presentation reflects work in progress. It is based on the provisional results of the Study, based on work both by UCL team and the steering committee, with the aim of collecting input from stakeholders on the most relevant options for implementing the Nagoya Protocol in Belgium